Filters
Pro LS 4340 Forged Steel H-Beam connecting rod, 6.098 in. length, .945 pin, ARP 2000 7/16 12 pt. rod bolts, full floating, stroker clearanced, LS1
Part Number: SUM-LS6098945
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, Retrofit, Small Block Chevy, Set of 16
Part Number: SUM-HT218-16
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Pro LS 4340 Forged Steel H-Beam Connecting Rod, 6.125 in. Length, .927 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Stroker Clearanced, LS1, Set of 8
Part Number: SUM-LS6125927
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Gantry Crane, Adjustable, 2,200 lb. Capacity, Steel, Black Painted, Each
Part Number: SUM-905226
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Torque Converter, Chevy, LS, 4L60E, 4L65E, 300mm, 10 in. Diameter, 2,800 - 3,200 Stall, Each
Part Number: SUM-700335
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Torque Converter, Pro LS, 11 in. Diameter, Chevy, 6L80E/6L90E, 3,000-3,200 Stall, Each
Part Number: SUM-700344
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Chevy LS Cylinder head, 210cc Cathedral port Intake Runner, 64cc Chamber, 2.02 Intake Valve 1.6 Exhaust Valve, 3.898+ bore sizes, Max .650 Lift, Each
Part Number: SUM-162LS210CATH
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Engine Run Stand, Test Stand, 1,500 lbs. Capacity, Steel, Black, 4-leg, Gauge Panel, Each
Part Number: SUM-918015
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Torque Converter, Pro LS, 11 in. Diameter, Chevy LS, 4L80E, 2.650 in. Hub Height, 3,000-3,200 Stall, Each
Part Number: SUM-700342
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Cylinder Head, Cast Iron, Assembled, 72cc Chamber, 165cc Intake Runner, Chevy, 302, 327, 350, 400, Each
Part Number: SUM-152123
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Lifters, Hydraulic Roller, Link Bar, 0.842 in. Outside Diameter, 2.685 in. Seat Height, Big Block Chevy, Set of 16
Part Number: SUM-HT219-16
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, Maximum Torque for Towing, 205/217 112+2, .500 /.500 Lift, 3-bolt, 4.8, 5.3, 6.0, 6.2
Part Number: SUM-K8718R1
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Combo, Cam and Springs, Duration 212/22X, Lift .552/.552, Springs, Chevy, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Kit
Part Number: CMB-09-0041
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Exhaust Pipe Kit, Header-Back, Weld-Up, 304 Stainless Steel, 18-Gauge, Polished, 3.00 in. Diameter, Universal, Kit
Part Number: SUM-670247
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Piston Ring Filer, Pro Ring Filers, Blue Powdercoated, 120 Grit. 0-1.000 in. Dial Indicator Range, Steel, 120V, Each
Part Number: SUM-970001
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Combo, Edelbrock 600cfm, Performer EPS, Fel-Pro, Summit Bolts, Summit Air Cleaner, Studs, Chevy, Kit
Part Number: CMB-03-0077
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Disc Brakes, Front, 11 in. Diameter Rotors, Solid, Vented, 1-Piston Calipers, Chevy, GM, Kit
Part Number: SUM-BK1500
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Disc Brakes, Front, 11 in. Diameter Rotors, Solid Surface, Vented, 1-Piston Calipers, Chevy, Kit
Part Number: SUM-BK1515
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Ford Windsor, 185 cc Int. Runner, 64cc Chamber, 2.02 Int./1.6 Exh. Hyd. Roller .600 Lift, 351W 1/2 in. head bolt holes- reducer sleeve if 289/302
Part Number: SUM-162SBF185WIN
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Pro LS 2618 Forged Piston, 4.000 bore, 1.326 C.H., 2cc Flat, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9,
Part Number: SUM-3269454000-2
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Cylinder Head, Vortec, Cast Iron, Assembled, 67cc Chamber, 175cc Intake Runner, Chevy, Small Block, Each
Part Number: SUM-151124
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Turbocharger, S475 Turbo, 75mm Inducer Size, 96mm Exducer Size, T6 Twin Scroll, 1.32 A/R, Journal Bearing, Each
Part Number: SUM-260050
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Disc Brakes, Front, 11.25 in. Diameter Rotors, Solid, Vented, 4-Piston Calipers, Ford, Kit
Part Number: SUM-BK1524
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Pistons, Pro LS 2618 Forged, 4.030 bore, 8cc dish, 4.000 in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-1109274030-8
Not Yet Reviewed
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943780-2F
Estimated Ship Date: Monday 3/17/2025
Estimated Ship Date: Monday 3/17/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.